I’m nearly there with a bathroom tiling Project and managed to make it this far before getting stumped!

I’ve got Marmox insulation board to lay beneath Warmup DCM-Pro mat. I had planned to use the fleece backed mat with adhesive but I can’t find the mat in the uk. So I’ll have to use the self adhesive mat but it won’t stick directly to the Marmox as it’s too rough.

I’m thinking of using self levelling compound to create a smooth surface and compensate for the adhesive that I don’t need to use.

Will I need to use a perimeter foam strip around the SLC? All the guidance I can find relates to SLC on top of the UFH and it expanding.
 

Reply to Self levelling prior to UFH in the Tiling on Underfloor Heating area at TilersForums.com

There are similar tiling threads here

  • Question
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in preparation for tiling. A couple of days after there's a lot of very fine cracks which have appeared, you...
Replies
5
Views
794
  • Question
Hi all, I've laid some Arditex NA over the kitchen floor area (not under cabinets. The area is 4.5m x 1.8m. The top third of the room is totally level. The remainder of the room has a slope...
Replies
3
Views
1K